News

Actions

First Warning Traffic: Monday road closures and bridge openings

Posted at 5:20 AM, Nov 13, 2017
and last updated 2017-11-13 05:20:33-05

MONDAY BRIDGE OPENINGS:

  • James River Bridge – 2:30 p.m.

Downtown Tunnel

  • The outside southbound lane on Court Street between Bart Street and Pavilion Drive will be closed from Tuesday, November 14th, through Friday, November 17th.  This is the turn lane to the Downtown Tunnel and Elizabeth River Tunnels (ERT) will be working to repair a fire main for the Tunnel during this closure.

I-64 Widening Project, Newport News/York County:

Segment I

  • Alternating single-lane closures on I-64 east and west from Lee Hall (Exit 247) and ending near Jefferson Avenue (Exit 255) on November 12-18, starting as early as 8 p.m. until 5 a.m.
  • Alternating single-lane closures on Fort Eustis Boulevard in both directions at the I-64 overpass on November 13-17, starting 8 p.m. to 5 a.m.
  • Full ramp closures on I-64 with signed detours in place as follows:
    • I-64 west off-ramp to Fort Eustis Boulevard (exits 250A) from 7 a.m. on November 11, until 7 a.m. on November 12.
    • I-64 west on-ramp from Jefferson Avenue (Route 143) from 7 a.m. on November 11, until 7 a.m. on November 12.
    • I-64 west off-ramp to Jefferson Avenue (exit 250B)
      • from 7 a.m. on November 12, until 5 a.m. on November 13.
      • from 10 a.m. to 2 p.m., on November 13-14.
    • I-64 west on-ramp from Fort Eustis Boulevard
      • from 7 a.m. on November 12, until 5 a.m. on November 13.
      • from 10 a.m. to 2 p.m., on November 13-14.

Segment II

  • Alternating single-lane closures on I-64 east and west from Colonial Parkway to Lee Hall (Exit 247) November 12-16 starting as early as 7 p.m. until 5 a.m.
  • Lane closures under flagger control on Jefferson Avenue at the I-64 overpasses on November 12-16, from 9 p.m. until 5 a.m. the following morning.
  • Lane closures under flagger control on Penniman Road at the I-64 overpasses on November 13-17, from 9 p.m. until 5 a.m. the following morning.
  • Full ramp closures on I-64 with signed detours in place, starting as early as 7 p.m. to 5 a.m. as follows:

o   I-64 west off-ramp to Route 143 (exit 243B) on November 12-16

o   I-64 east on- and off-ramps at Route 199 west (exit 242A) on November 12-16

o   I-64 west on-ramp from Route 199 east on November 12-16

o   I-64 east off-ramp to Route 60 Busch Gardens (exit 243A) on November 12-16

I-64, Hampton Roads Bridge-Tunnel:

  • Single-lane closures as follows. One lane will remain open at all times:
  • I-64 east November 12-16 from 9 p.m. to 5 a.m.
  • I-64 west November 13-16 from 9 p.m. to 5 a.m.

I-664, Monitor-Merrimac Memorial Bridge-Tunnel: Alternating lane closures in Newport News as follows:

  • Alternating lane closures I-664 south between 25th Street (Exit 6) and the MMMBT. One lane will remain open at all times:
  • November 17 from 9 p.m. to 8 a.m.
  • November 18 from 8 p.m. to 6 a.m.
  • Alternating lane closures I-664 north between MMMBT and 25th Street (Exit 6). One lane will remain open at all times:
  • November 15 and 16 from 8 p.m. to 5 a.m.
  • November 17 from 9 p.m. to 7 a.m.
  • November 18 from 8 p.m. to 9 a.m.
  • November 19 from 7 p.m. to 5 a.m.

I-64, High Rise Bridge:

  • Single-lane closures west November 13 and 14 from 9 p.m. to 5 a.m.
  • East/West 20-minute stoppages November 11 between midnight and 3 a.m. then full closure of the High Rise Bridge from 3 a.m. to 5 a.m. Signed detour will be in place.
  • East/West 20-minute stoppages November 12 between 11 p.m. and 4 a.m.

I-64 Reversible Roadway: The Reversible Roadway will be closed as follows:

  • November 12-17 from 9 a.m. to 2 p.m. and from 9 p.m. to 4 a.m.

Route 17, James River Bridge:

  • Route 17 south single-lane closures November 12-17 from 9 p.m. to 5 a.m.

Route 17, Suffolk:

  • U.S. 17 north ramp closure to I-664 south (Exit 34A) November 12-15 from 8 p.m. to 5 a.m.

 Route 164 East/West, Portsmouth: Single-lane closures as follows:

  • Alternating lane closures between Towne Point Road and West Norfolk Bridge November 13-17 from 8 a.m. to 3 p.m.

 

I-564, Norfolk:

  • I-564 west dual-lane closure at Terminal overpass from November 12-17 from 9 p.m. to 4 a.m.
  • I-564 east dual-lane closures at I-64 interchange November 13-17 from 7 p.m. to midnight.
  • I-564 west single-lane closure at the Runway Tunnel November 16 from 9 a.m. to 11 a.m.

 I-564 Intermodal Connector Project: Go to www.i564intermodal.com/press-room/traffic-alerts/ for the latest project and traffic updates.

 

Military Highway Continuous Flow Intersection, Norfolk:

  • Alternating single-lane closures November 12-18 from 9 a.m. to 3 p.m. and from 7 p.m. to 5 a.m. the following morning. One lane will remain open at all times on:

o   Military Highway between Valley Drive and Lynn Street.

o   Princess Anne Road between Sigmon Street and Military Highway.

o   Northampton Boulevard between Military Highway and past USAA Drive.

o   Robin Hood Road between Military Highway and Miller Store Road.

Turnpike Road Reconstruction Project, Portsmouth: Full closure in both directions on Frederick Boulevard at the Turnpike Intersection starting October 9 – November 17. Signed detour will be in place.

VA Route 31, James City County: Full closures in both directions between Sandy Bay Road and Landfall Drive November 14-16 from 9 a.m. to 3 p.m. Stoppages managed by flaggers.  

Route 60 (Pocahontas Trail), James City County:

  • Full closure in both directions at Skiffes Boulevard. Stoppages managed by flaggers. November 13-17 from 9 a.m. to 3 p.m.

Courtland Interchange Project: US-58, Southampton County: Alternating lane closures in both directions on U.S. 58 as follows. One lane will remain open at all times:

  • Starting at 6 a.m. November 13 and ending no later than noon November 17 between Old Bridge Road (Route 742) and Shady Brook Trail (Route 650).

I-95, Greensville County: Single-lane closures in both directions starting near Exit 11 (Route 58) and ending before Exit 8 (Route 301). One lane will remain open at all times:

  • November 13-16 from 9 a.m. to 4 p.m.

I-95 South, Sussex County: Single-lane closures starting near the ramp from Route 40 to Sussex town line November 14 from 9 a.m. to 4 p.m. One lane will remain open at all times.