News

Actions

Test lifts scheduled at the Great Bridge Bridge

Posted at 11:20 AM, Jun 16, 2014
and last updated 2014-06-16 11:20:09-04

Chesapeake, Va. – The Bridges Division will conduct test lifts at the Great Bridge Bridge during the following dates and times:

Wednesday, June 18th at 2 p.m., 3 p.m., and 4 p.m. (these are regularly scheduled lifts that will take place with or without marine traffic) and between 10 p.m. and midnight (multiple lifts will be made during this time period); Thursday, June 19 at 10 a.m., 11 a.m. and noon (these are regularly scheduled lifts that will take place with or without marine traffic).

Stay tuned for updates as they are released.